用户:密码:
公告:
国际模具网,服务模具、机械、塑料、五金行业网路营销

相关资讯

首页>>资讯

外向型塑料制品企业常用的英语词汇

时间:2007-7-6 9:34:30

国际模具网

一、组织机构及职位 

 XX电子有限公司XX Electronics CO., Ltd
 总经理办公室General manager’s office
 企管部Enterprise management department (EM)
 行政部Administration department (AD)
 销售部Sales department (SD)
 财务部Financial department (FD)
 技术部Technology department (TD)
 物控部Production material control department (PMC)
 生产部Production department(PD)
 模具部Mold manufacturing department, Tooling manufacturing department (TM)
 品管部Quality Assurance department (QA)
 冲压车间Stamp workshop, press workshop
 注塑车间injection workshop
 装配车间Assembly workshop
 模具装配车间Mold and die Assembly workshop
 金属加工车间metal machine workshop
 电脉冲车间Electric discharge process workshop
 线切割车间wire cutting process workshop
 工磨车间Grinding workshop
 总经理General manager (GM)
 副总经理Vice-general manager
 经理manager
 董事长president
 副董事长Vice-president
 XX部门经理Manager of XX department
 主任、主管supervisor
 拉长Line leader
 组长Foreman, forelady
 秘书secretary
 文员clerk
 操作员operator
 助理assistant

二、产品 

 连接器connector
 端子terminal
 条型连接器bar connector
 阴连接器Housing
 阳连接器wafer
 线束wire harness
 间距space
 额定电压 rated voltage
 额定电流 rated current
 接触电阻contact resistance
 绝缘电阻insulation resistance
 超声波焊接ultrasonic welding
 耐压withstand voltage
 针pin
 物料编号part number
 导线wire
 基体金属Base metal
 电缆夹cable clamp
 倒角chamfer
 接触面积contact area
 接触件安装孔contact cavity
 接触长度contact length
 接触件电镀层contact plating
 接触压力contact pressure
 接触件中心距contact space
 接触簧片contact spring
 插孔socket contact
 法兰、凸缘Flange
 界面间隙interfacial gap
 键Key
 键槽keyway
 过渡段ramp
 屏蔽套shielding
 定位基准Datum reference
 扁平电缆flat cable ,Ribbon cable
 柔性印刷电线Flexible printed wiring
 多层印制电路Multilayer printed circuit
 焊盘pad
 图形pattern
 间距pitch
 负极Negative pole
 正极positive pole
 回流Reflow
 原理图Schematic diagram
 单面板single sided board
 双面板Two-sided board,Double-sided board
 表面安装surface Mounting
 翘曲warp, bow
 波峰焊wave soldering
 编织层braid
 同轴电缆coaxial cable
 电介质dielectric
 电缆中导线的头数ends
 外部干扰external interference
 填充物filler
 护套jacket
 比重specific gravity
 电阻的温度系数Temperature coefficient of resistance

三、模具 

 塑料模具mould of plastics
 注塑模具injection mould
 冲压模具die
 模架mould base
 定模座板Top clamping plate
 Top plate
 Fixed clamp plate
 水口推板stripper plate
 A板A plate
 B板B plate
 支承板 support plate
 方铁 spacer plate
 底针板 ejector plate
 面针板 ejector retainer plate
 回针 Return pin
 导柱 Guide pin
 有托导套 Shoulder Guide bush
 直导套 Straight Guide bush
 动模座板Bottom clamp plate
 Moving clamp plate
 基准线datum line
 基准面datum plan
 型芯固定板core-retainer plate
 凸模固定板punch-retainer plate
 顶针ejector pin
 单腔模具single cavity mould
 多腔模具multi-cavity mould
 多浇口multi-gating
 浇口gate
 缺料starving
 排气breathing
 光泽gloss
 合模力mould clamping force
 锁模力mould locking force
 挤出extrusion
 开裂crack
 循环时间cycle time
 老化aging
 螺杆screw
 麻点pit
 嵌件insert
 活动镶件movable insert
 起垩chalking
 浇注系统feed system
 主流道 sprue
 分流道runner
 浇口gate
 直浇口direct gate , sprue gate
 轮辐浇口spoke gate , spider gate
 点浇口pin-point gate
 测浇口edge gate
 潜伏浇口submarine gate , tunnel gate
 料穴cold-slug well
 浇口套sprue bush
 流道板runner plate
 排飞槽vent
 分型线(面)parting line
 定模stationary mould,Fixed mould
 动模movable mould, movable half
 上模upper mould, upper half
 下模lower mould, lower half
 型腔cavity
 凹模cavity plate,cavity block
 拼块split
 定位销dowel
 定位销孔dowel hole
 型芯core
 斜销angle pin, finger cam
 滑块slide
 滑块导板slide guide strip
 楔紧块heel block, wedge lock
 拉料杆sprue puller
 定位环locating ring
 冷却通cooling channel
 脱模斜度draft
 滑动型芯slide core
 螺纹型芯threaded core
 热流道模具hot-runner mould
 绝热流道模insulated runner mould
 熔合纹weld line (flow line)
 三板式模具three plate mould
 脱模ejection
 换模腔模具 interchangeable cavity mould
 脱模剂release agent
 注射能力shot capacity
 注射速率injection rate
 注射压力injection pressure
 差色剂colorant
 保压时间holdup time
 闭模时间closing time
 定型装置sizing system
 阴模female mould,cavity block
 阳模male mould
 电加工设备Electron Discharge Machining
 数控加工中心CNC machine center
 万能铁床Universal milling machine
 卧式刨床Horizontal planer
 车床Engine lathe
 平面磨床Surface grinding machine
 去磁机Demagnetization machine
 万能摇臂钻床Universal radial movable driller
 立式钻床Vertical driller
 超声波清洗机Ultrasonic clearing machine

四、品管 

 SPC statistic process control
 品管保证Quality Assurance
 品管控制Quality control
 来料检验IQC Incoming quality control
 巡检IPQC In-process quality control
 校对calibration
 动态试验dynamic test
 环境试验Environmental test
 非破坏性试验non-destructive test
 光泽gloss
 击穿电压(dielectric) breakdown voltage
 拉伸强度tensile strength
 冷热骤变试验thermal shock test
 环境试验炉Environmental chamber
 盐雾实验salt spray test
 绝缘电阻测试验仪Insulating resistance meter
 内应力internal stress
 疲劳fatigue
 蠕变creep
 试样specimen
 撕裂强度tear strength
 缩痕shrink mark, sink mark
 耐久性durability
 抽样sampling
 样品数量sample size
 AQL Acceptable Quality level
 批量lot size
 抽样计划sampling plan
 OC曲线operation curve
 试验顺序sequence of tests
 环境温度ambient temperature
 可焊性solderability
 阻燃性flame resistance

五、生产 

 注塑机injection machine
 冲床Punch machine
 混料机blender mixer
 尼龙nylon
 黄铜 brass
 青铜 bronze
 紫(纯)铜 copper
 料斗hopper
 麻点pit
 配料compounding
 涂层coating
 飞边flash
 预热preheating
 再生料reworked material
 再生塑料reworked plastics
 工艺设计process design
 紧急停止emergency stop
 延时time delay

六.物控

保质期shelf life
ABC分类法ABC Classification
反常需求Abnormal Demand
措施信息Action Message
活动报告标志Action-report-flag
基于活动的成本核算Activity-based Costing (ABC)
实际能力Actual Capacity
实际成本Actual Costs
调整现有库存量Adjust-on-hand
已分配量Allocation
替代工序Alternative Routine
装配订单Assembly Order
装配零件表Assembly Parts List
装配Assembly
计划自动重排Automatic Rescheduling
可达到库存Available Inventory
可用材料Available Material
达到库存Available Stock
可利用工时Available Work
可签约量Available-to-promise
平均库存Average Inventory
欠交订单Back Order
倒序计划Back Scheduling
倒冲法Back flush
未完成订单Backlog
现有库存余额Balance-on-hand Inventory
批号Batch Number
批量生产Batch Production
标杆瞄准Benchmarking
工时清单Bill of Labor
提货单Bill of Lading
物料清单Bill of Material
分库Branch Warehouse
经营规划Business Plan
采购员Buyer
能力管理Capacity Management
能力需求计划Capacity Requirements Planning (CRP)
保管费率Carrying Cost Rate
保管费Carrying Cost
单元式制造Cellular Manufacturing
修改批量日期Change Lot Date
修改工序Change Route
修改产品结构Change Structure
检查点Check Point
闭环物料需求计划Closed Loop MRP
通用工序标识Common Route ID
计算机集成制造Computer-integrated Manufacturing (CIM)
配置代码Configuration Code
约束管理/约束理论Constraints Management/Theory of Constraints (TOC)
依成本的材料清单Costed Bill of Material
急需零件Critical Part
累计提前期Cumulative Lead Time
现有运转时间Current Run Hour
现有运转数量Current Run Quantity
周期盘点Cycle Counting
调整日期Date Adjust
有效日期Date Available
修改日期Date Changed
结束日期Date Closed
截止日期Date Due
生产日期Date in Produced
库存调整日期Date Inventory Adjust
作废日期D ate Obsolete
收到日期Date Received
交付日期Date Released
需求日期Date Required
发货日期Date to Pull
空负荷Dead Load
需求管理Demand Management
需求Demand
实际能力Demonstrated Capacity
非独立需求Dependent Demand
直接增减库存处理法Direct-deduct Inventory Transaction Processing
发料单Disbursement List
派工单Dispatch List
分销资源计划Distribution Resource Planning (DRP)
鼓-缓冲-绳子Drum-buffer-rope
经济订货批量Economic Order Quantity (EOQ)
工程变更生效日期Engineering Change Effect Date
工程变更生效单Engineering Change Effect Work Order
工程停止日期Engineering Stop Date
例外控制Exception Control
呆滞材料分析Excess Material Analysis
急送代码Expedite Code
加工订单Fabrication Order
补足欠交Fill Backorder
总装提前期Final Assembly Lead Time
确认的计划订单Firm Planned Order
固定订货批量F ixed Order Quantity
集中预测Focus Forecasting
完全跟踪Full Pegging
通用生产管理原则Generally Accepted Manufacturing Practices
毛需求Gross Requirements
在制品库存In Process Inventory
独立需求Independent Demand
投入/产出控制Input/ Output Control
检验标识Inspection ID
厂际需求Interplant Demand
库存周转率Inventory Carry Rate
仓库库位类型Inventory Location Type
库存周转次数Inventory Turnover
发送订单Issue Order
项目记录Item Record
物料项目Item
加工车间Job Shop
准时制生产Just-in-time (JIT)
看板Kanban
人工工时Labor Hour
最后运输日期Last Shipment Date
提前期Lead Time
层Level
负荷量Load Leveling
负荷报告Load Report
负荷Load
仓位代码Location Code
仓位备注Location Remarks
仓位状况Location Status
按需订货Lot for Lot
批量标识Lot ID
批量编号Lot Number
批量Lot Size
低位码Low Level Code
机器能力Machine Capacity
机器加载Machine Loading
外购或自制决策Make or Buy Decision
面向订单生产的产品Make-to-order Product
面向库存生产的产品Make-to-stock Product
制造周期时间Manufacturing Cycle Time
制造资源计划Manufacturing Resource Planning (MRP II)
主生产计划Master Production Schedule (MPS)
物料成本Material Cost
物料发送和接收Material Issues and Receipts
物料需求计划Material Requirements Planning (MRP)
登陆标志MPS Book Flag MPS
多重仓位Multiple Location
净改变式MRP N et Change MRP
净需求Net Requirements
新仓位New Location
新组件New Parent
新仓库New Warehouse
不活动报告No Action Report
现有库存量On-hand Balance
未结订单Open Order
订单输入Order Entry
订货点Order Point
订货方针Order Policy
订货承诺Order Promising
订货备注Order Remarks
双亲Parent
零件清单Part Bills
零件批次Part Lot
零件编号Part Number
零件Part
反查Pegging
领料单Picking List
领料/提货Picking
计划订单Planned Order
后减库存处理法Post-deduct Inventory Transaction Processing
前减库存处理法Pre-deduct Inventory Transaction Processing
发票价格Price Invoice
采购订单价格Price Purchase Order
优先计划Priority Planning
产品控制Product Control
产品线Production Line
生产规划编制Production Planning
产品率Production Rate
产品结构树Production Tree
预计可用库存Projected Available Balance
采购订单跟踪Purchase Order Tracking
已分配量Quantity Allocation
仓位数量Quantity At Location
欠交数量Quantity Backorder
完成数量Quantity Completion
需求量Quantity Demand
毛需求量Quantity Gross
进货数量Quantity In
排队时间Queue Time
队列Queue
重生成式MRP Regenerated MRP
重排假设Rescheduling Assumption
资源需求计划Resource Requirements Planning
粗能力计划Rough-cut Capacity Planning
工艺路线Routing
安全库存量Safety Stock
保险期Safety Time
预计入库量Scheduled Receipt
残料率Scrap Factor
发送零件Send Part
维修件Service Parts
发货地址Ship Address
发货单联系人Ship Contact
发货零件Ship Date
发货单Ship Order
工厂日历Shop Calendar
车间作业管理Shop Floor Control
损耗系数Shrinkage Factor
标准产品成本Standard Product Cost
标准机器设置工时Standard Set Up Hour
标准单位运转工时Standard Unit Run Hour
标准工资率Standard Wage Rate
状况代码Status Code
库存控制Stores Control
建议工作单Suggested Work Order
约束理论Theory of Constraints (TOC)
时间段Time Bucket
时界Time Fence
单位成本Unit Cost
采购计划员Vendor Scheduler
采购计划法Vendor Scheduling
工作中心能力Work Center Capacity
工作中心Work Center
在制品Work in Process
工作令跟踪Work Order Tracking
工作令Work Order
工作进度安排Work Scheduling
零库存Zero Inventories
经济订货批量=Squat(2*年订货量*平均一次订货准备所发生成本/每件存货的年储存成本)
美国生产和库存控制协会APICS,American Production & Inventory Control Society

七.QS-9000中的术语 

 APQP Advanced Product Quality Planning and Control Plan,产品质量先期策划和控制计划
 PPAP Production Part Approval Process,生产件批准程序
 FMEA Potential Failure Mode and Effects Analysis,潜在失效模式及后果分析
 MSA Measure System Analysis,测量系统分析
 SPC Statistical Process Control,统计过程控制
 审核 Audit
 能力 Capability
 能力指数 Capability Indices
 控制计划 Control Plans
 纠正措施 Corrective Action
 文件 Documentation
 作业指导书 Job Instruction, work instruction
 不合格品 Nonconformance
 不合格 Nonconformity
 每百万零件不合格数 Defective Parts Per Million, DPPM
 预防措施 Preventive Action
 程序Procedures
 过程流程图 Process Flow Diagram, Process Flow Chart
 质量手册Quality Manual
 质量计划 Quality Plan
 质量策划 Quality Planning
 质量记录Quality Records
 原始数据Raw Data
 反应计划Reaction Plan
 返修Repair。
 返工Rework
 现场Site
 分承包方Subcontractors
 产品product
 质量quality
 质量要求quality requirement
 顾客满意customer satisfaction
 质量管理体系quality management system
 质量方针quality policy
 质量目标quality objective
 质量管理quality management
 质量控制quality control
 质量保证quality assurance
 组织organization
 顾客customer
 供方supplier
 过程process
 服务service
 设计与开发design and development:
 特性characteristic
 可追溯性trace ability
 合格conformity
 缺陷defect
 纠正correction
 让步concession
 放行release
 报废scrap
 规范specification
 检验inspection
 试验test
 验证verification
 评审review
 测量measurement
 计数型数据Attributes Data
 普通原因Common Cause
 单值Individual
 均值Mean
 随机抽样Random Sampling
 极差Range
 特殊原因Special Cause
 稳定性Stability
 子组Subgroup
 计量型数据variables Data
 变差variation
 固有变差Inherent variation
 总变差Total variation
 偏倚Bias
 重复性Repeatability
 再现性Reproducibility
 稳定性Stability
 线性Linearity
 分辨率Resolution
 过程更改Process change
 质量功能展开QFD
 过程特殊特性Special Process Characteristic
 产品特殊特性Special Product Characteristic
 外观项目Appearance Item
 初始过程能力Preliminary Process Capability
 材料清单Bill of Material
 设计确认Design Validation
 设计验证Design Verification
 顾客的呼声Voice of the Customer
 过程的呼声Voice of the Process

八.常用缩略词语 

 1、ES 工程规范 Engineering Specification
 2、KCC 关键控制特性(GM)Key Control Characteristic
 3、KPC 关键产品特性(GM)Key Product Characteristic
 4、OEM 整车厂 Original Equipment Manufacturer
 5、SC重要(特殊)特性 Significant(Special) Characteristic
 6、ANOVA 方差分析法 Analysis of variance
 7、CFT 多方论证小组 Cross function Team
 8、DFMEA 设计失效模式及后果分析 Design Failure Mode and Effects Analysis
 9、DOE 试验设计 Design of Experiment
 10、DVP&R 设计验证计划和报告 Design verification Plan and Report
 11、FTC 试生产能力 First Time Capability
 12、GR&R 量具的重复性和再现性Gage Repeatability and Reproducibility
 13、PFMEA 过程失效模式及后果分析Process Failure Mode and Effect Analysis
 14、SFMEA 系统失效模式及后是分析 System Failure Mode and Effect Analysis
 15、QSR 质量体系要求 Quality System Requirement
 16、QFD 质量功能展开 Quality function Deployment
 17、TGR 运行情况良好 Things Gone Right
 18、TGW 运行情况不良 Things Gone Wrong
 19、VE/VA 价值工程/价值分析 Value Engineering/Value Analysis
 20、BOM 物料清单 Bill of Material
 21、Cpk 稳定过程的能力指数 Capability for stable process
 22、LCL 下控制限 Lower Control Limit
 23、UCL 上控制限 Upper Control Limit
 24、LSL 工程规范下限 Lower Specification Limit
 25、USL 工程规范上限 Upper Specification Limit
 26、Ppk 性能指数 The performance index
 27、MRB 物料评审 Material Review Board
 28、PSW 零件提交保证书 Part Submission Warrant
 29、X(—)--R图 均值一极差图 Average-Range Chart
 30、SRPC 供方要求产品更改 Supplier Request for Product Change
 31、SREA 供方工程批准的要求 Supplier Request for Engineering Approval
 32、IAA 临时批准授权 Interim Approval Authorization
 33、AAR 外观件批准报告 Appearance Approval Report
 34、PTR 试生产(报告) Production Trial Run (Report)
 35、DCP尺寸控制计划(动态控制计划)Dimension Control Plan (Dynamic Control Plan)
 37、防错(POKA-YOKE)Mistake Proofing

国际模具网

PET碳酸饮料瓶出台行业标准<<上一条 下一条>>东莞出现模具数控实训基地